Our electrical, instrumentation and automation specialists take care of the system’s testing and start-up activities, ensuring our Customers expertise, professionalism and experience

Testing and
plant start-up

We can ensure competence and professionalism
also in the testing, commissioning and maintenance
phases of all kinds of systems.

Verification of correct installation

  • Check cables, insulation tests
  • Check protections
  • Check the cyclic direction of the phases
  • Check correspondence with the project documents

Cold tests (no-load test)

  • Functional tests of the single machines
    (motor rotation tests, local-remote control)
  • Instrumentation checks
    (instrument calibration, valve alignment, loop-check)
    Hot tests (on-load test)
  • Check, sequences, blocks, and safeties
  • Integrated functional tests

Commissioning

  • Start-up assistance
  • Support and training of the operating personnel
    Handover of the plant
  • Use and maintenance manuals
  • Certifications
  • End of project dossier

 

Every problem identified and solved during a Factory Test is a huge time saving on site

Testing Area

We believe that the testing of a system, electrical or automation, is a fundamental moment in which to verify, in addition to its correct implementation, that the design performs the functions required by the process with which it will have to interface.

We have a large staging area where we carry out integrated F.A.T. (Factory Acceptance Test) which verify the correct production of a panel and test every single function of panels.

In this way we can guarantee the efficiency of the whole system even before its installation.